Home > News > Articles

HDPE Pipe for Water Supply Dn32

2018-11-14

Basic Info

  • Compound Material: HDPE

  • Installation and Connection: Hot Melt Type Installation

  • Steel Skeleton PE Pipe Use: Water Supply

  • Specification: dn32

  • HS Code: 39173100

  • Material: HDPE

  • Plastic Composite Pipe Model: Em002

  • Trademark: SUNPLAST

  • Origin:  Zhejiang Province

Product Description

     Product Description

--HDPE pipes  Introduction--

HDPE water supply pipe use PE100 or PE80  as raw materials, processing good flexibility, corrosion resistance, excellent impact resistance and other characteristics, pipe and fittings can be employed melt socket connection,  Butt and fused connection,to insure the pipe system safety and reliability as well as low construction cost.
 
1) Material:PE100/PE80                                   2) Standard:GB/T9001-2000

3) Certification:ISO9001:2008                          4) Package:Nuded packing 

5) Connection:Butt fusion,socket joint ,electric connect

6) Color:black with blue stripe or customized 

7) Pressure  rating:1.6Mpa,1.25Mpa,1.0Mpa,0.8Mpa,0.6Mpa
 
--Product Features--

1) Non-toxic,No Leakage.                  5) Hygienic Safety

2) Smooth Surface                              6) Corrosion resistant.

3) Excellent Flexibility                         7) Recycle and environment-friendly

4) Easy Installation and Lower costs

--Product Specification--



--Applications--

1) Municipal water supply, gas supply and agriculture etc.

2) Commercial & Residential water supply

3) Industrial liquids transportation

4) Sewage treatment

5) Food and chemical industry

7) Replacement of cement pipes and steel pipes

8) Argillaceous silt, mud transportation

9) Garden green pipe networks
 
--Product Installation--

Mainly connection ways
1)  Dn≤110mm,Use hot melt socket connection or fused connection
     Dn≥110mm,Use butt fusion connection or fused connention

2)  Connection with metal pipe and metal fittings ,can connected by flange connection 


--Product Photos--


--Sales Service--

Packaging :roll plastic bag for pipe ,put fittings into nylon bags then out of carton

Shipping:For samples order ,we support transfer by international express,such as FEDEX,DHL,TNT or EMS;
For final order,we do sea shipping ,our factory are near from shanghai port and ningbo port ,we can transfer goods to port within 6 hours 

Delivery : Within 15-30 days after receiving deposit

We promise our customers the Best-Quality products with reasonable price.

X
We use cookies to offer you a better browsing experience, analyze site traffic and personalize content. By using this site, you agree to our use of cookies. Privacy Policy
Reject Accept